top of page
header-06.png

Decorative Crosswalk

Project Highlights

Untitled-5.png
Untitled-5.png
Untitled-5.png
Untitled-5.png
Untitled-5.png

The first decorative crosswalk of its kind in Cobb County

 

The pedestrian crossing introduces vibrant color and artistic design while maintaining full compliance with Cobb DOT and federal roadway standards

 

Improves crosswalk visibility for motorists and trail users, increasing safety

 

Includes slip resistant reflective material

 

Reinforces Town Center as a connected, forward-thinking district that values mobility and sense of place

Project Overview

The decorative crosswalk is part of a pilot project fully funded by the Town Center Community and is designed to reflect the district’s commitment to strengthening trail connectivity and creating a stronger sense of place throughout Town Center.


Along the highly traveled Noonday Creek Trail, the installation is the first decorative crosswalk of its kind in Cobb County. The pedestrian crossing, located at George Busbee Pkwy and Town Center Drive, introduces the vibrant colors of the Town Center Community brand while maintaining full compliance with Cobb DOT and federal roadway standards. This enhancement improves crosswalk visibility for motorists and creates a safer, more engaging experience for pedestrians and cyclists.

The pilot period will allow the district to evaluate longevity, visibility and overall impact before considering additional installations at other trail crossings. If successful, additional Noonday Creek Trail crossings within the district may be

enhanced in future phases.

Community Input

Provide your input on the decorative crosswalk below.

Partners

Cobb DOT
Geveko Markings
Big Apple

TCCID_PINDROP ONLY_White.png

Join our mailing list

Thanks for subscribing!

© 2022, Town Center CID. All Rights Reserved.
  • Instagram
  • Facebook
  • Twitter
  • LinkedIn
Contact

t: 678.350.5061
e: info@towncentercid.com

1825 Ba
rrett Lakes Boulevard
Suite 250
Kennesaw, GA | 30144
bottom of page